Sopot cold storage
On September 18, 2017, in Sopot, the handover and putting into operation of the cold storage was performed per “turn-key” system. The opening was attended by - the investor, the design supervision, the electrical control and the representatives of the cooling equipment suppliers. Both cooling machines were put into operation, and for 1h the temperature reached 0 degrees in antechamber and chamber.